Please enable JS

As-Built Drawings and Works Supervision of the Rades-La Goulette Bridge and Interchange

Client

Country

Tunisia

Beginning

2000

End

2009

Description

This study was entrusted to the Nippon Koei/STUDI/SCET/PCI Group by the Ministry of Equipment and Housing. The project links Rades to La Goulette by spanning Tunis Lake. The junction is made at the Tunis-La Goulette expressway level where a new interchange will be built. The Rades-La Goulette suspended bridge (260m), the first of its kind in Tunisia, provides a direct and continuous link between the northern and southern suburbs of the capital.

Services

  • Preliminary and detailed design
  • Preparation of tender documents
  • Construction works monitoring and management

Newsletter