The railway line covered by the project is among the short-term priority routes. The Ngaoundéré-Bertoua-Douala section is approximately 1,147km long, and will give a strong impulse to the negotiations on the operation of the bauxite mines of Adamaoua and the S4 route plan. Design will be limited to a feasibility study, including technical, socio-economic and environmental aspects.