Please enable JS

Preliminary and Detailed Design of the Priority Aviation Safety Project (PPSA) Phase II

Client

Régie des Voies Aérienne (RVA)

Country

RD of Congo

Beginning

2015

End

In progress

Description

After a first upgrading stage, Regie des Voies Aeriennes (Airport Authority) is laying the ground for the future. It is in this context that the second phase of the Priority Air Safety Project (PPSA) takes place representing the logical next step of the PPSA 1. It includes construction and renovation works of airport control towers not covered by the PPSA 1, construction of fire stations and ICAO safety fences, acquisition of firefighting and rescue vehicles, airport security equipment as well as other works and equipment intended for the improvement of aviation safety. The main asstes included in the PPSA 2 are Mbuji-Mayi Airport and Kindu Airport.

Services

  • Site diagnosis and preliminary study
  • Traffic and economic feasibility studies
  • Environmental and social impact assessment
  • Preliminary design
  • Detailed design and preparation of tender documents

Newsletter