Feasibility Studies, Preliminary Design, Detailed Design and Tender Documents of the Samendeni Hydroelectric Dam (1 billion m3)

Client

Direction des Etudes et de la Planification du Ministère de l’Agriculture, de l’Hydraulique et des Ressources Halieutiques

Country

Burkina Faso

Beginning

2006

End

2007

Description

The project is part of the sustainable development policy of Burkina Faso and plans the construction of a 1-billion m3 and 23 meter-high hydro-irrigation and hydroelectric dam as well as the development of a 20,000ha irrigated perimeter with a priority component of 1,500ha.

Services

  • Preliminary studies for the hydroelectric dam and preparation of detailed design and tender documents
  • Preliminary studies of hydro-agricultural development, preparation of detailed design and tender documents
  • Preparation of studies on fisheries, tourism and agro-industrial aspects, environmental, economic and financial impact and implementation of a dynamic model