Master Plan for Power Production and Transport

Client

Haut-Commissariat à l’Aménagement de la Vallée du Niger (HCAVN)

Country

Niger

Beginning

2015

End

2016

Description

The design of a master plan for the production and transmission of electricity in Niger aims to develop a short, medium and long-term investment plan (2015 - 2035) for the production and transport of electrical energy throughout the national territory. The objective will be to minimize the cost of electricity supply in the country within the permissible limits of reliability.

Services

  • Analysis and forecast of electricity demand
  • Diagnosis and analysis of the current state of electrical production system
  • Study of the integration of energy imports from Nigeria and energy purchase from private producers
  • Preparation of a technical and economic comparative analysis
  • Preparation of a summary assessment of social and environmental impact costs
  • Definition of an optimal development plan for Niger's electricity production-transport system
  • Preparation of a short, medium and long-term equipment plan