The design of a master plan for the production and transmission of electricity in Niger aims to develop a short, medium and long-term investment plan (2015 - 2035) for the production and transport of electrical energy throughout the national territory. The objective will be to minimize the cost of electricity supply in the country within the permissible limits of reliability.