The purpose of the assignment consisted in conducting the necessary technical studies to renovate the structures of El Kantaoui port. This study included, more particularly, a submarine inspection along the docks, a technical assessment, a detailed design for the upgrade of detected anomalies, preparation of tender documents and supervision of construction works.