Standardization of the Ouesso Airport Runways to A340 Requirements

Client

Délégation Générale des Grands Travaux (DGGT)

Country

Congo

Beginning

2011

End

2016

Description

The existing runway was built in 1982 using the operating standards for the B737-200 category. The aim was to create a 2,500m-long and 300m-wide flight strip that can host a runway of 2,050m long and 30m wide with anti-blast strips on both sides, a ramp and a parking area.

Services

  • General site inspection and preliminary technical design
  • Preparation of preliminary and detailed design and tender documents
  • Works management and supervision