Please enable JS

Feasibility Study of the Implementation of a 50 MW CSP Solar Thermal Power Plant with Storage at Akarit and a 10 MW Photovoltaic Power Station in Tozeur

Client

Lahmeyer International

Country

Tunisia

Beginning

2011

End

2012

Description

The terms of reference of this project aimed to implement a technical and economic study related to the development of a 10 MW photovoltaic plant and a 50 MW CSP power station with storage capacity.

Services

  • Project coordination, management and organization
  • Preliminary analysis of the electricity sector and verification of CSP and PV sites
  • Training and capacity building
  • Findings presentation
  • Presentation of project options and preparation of tender documents

Newsletter