Please enable JS

Technical Studies for the Development of the Industrial Port of Kribi (3,000ha)

Client

Le Délégué du Gouvernement auprès de la CUY

Country

Cameroon

Beginning

2014

End

2015

Description

The General Development Plan for the South of Kribi plans the implementation of port, industrial and urban facilities at the sites of Kribi, Grand Batanga, Mboro and Lolabe, leading to what should be called the Kribi Port Complex. The area under study results from the programming and phasing established by the General Plan for the Development of the Industrial Port of Kribi. The area extends to 3,000ha and is covered with vegetation and crossed by a few rivers.

Services

  • Topographic and geotechnical design and hydrological data collection
  • Studies of roads and bridges
  • Setting out of water of the Kribi area
  • Environmental and social impact studies
  • Preliminary and detailed design and tender documents

Newsletter