Please enable JS

Technical As-Built Drawings and Preparation of Tender Documents for the Execution of Construction Works of the Second 722m-long Bridge of Ziguinchor on the River of Casamance and the Baila and Diouloulou Bridges Reconstruction

Client

AGETUR

Country

Senegal

Beginning

2011

End

2013

Description

The Ziguinchor Region has experienced many years of drought which has led to a rise in salt water, affecting all the rivers and banks of the Casamance River. This has resulted in the acceleration of the degradation process of several structures, particularly those including metal elements. Diagnosis conducted in 2001 and 2005 revealed very serious damage to the Emile Badiane Bridge in Ziguinchor and the Baïla and Diouloulou bridges.

Services

  • Preliminary design, technical and economic feasibility studies
  • Social, economic and traffic studies, geometric road design
  • Preparation of an Environmental and Social Management Plan (ESMP)
  • Preliminary and detailed design
  • Preparation of tender documents