Please enable JS

Technical design of Damazin-Renk, Kadugli-Higlieg and Mujlad–Abyei Roads Development

Client

National Highway Authority

Country

Sudan

Beginning

2008

End

2011

Description

The project consists of the development of the Damazin-Renk road on a 200 km section. It includes the conduct of a feasibility study, technical (AASHTO standard), environmental and social and economic study, a detailed design and the preparation of tender documents. The road is located in Southern Sudan in an agricultural floodplain.

Services

  • Preliminary studies
  • Technical and economic feasibility study
  • Detailed design
  • Preparation of tender documents

Newsletter