Please enable JS

Feasibility Studies for Ngaoundéré-Douala Railway Routes (site 3)

Client

Ministère des Travaux Publics du Cameroun

Country

Cameroon

Beginning

2016

End

2016

Description

The railway line covered by the project is among the short-term priority routes. The Ngaoundéré-Bertoua-Douala section is approximately 1,147km long, and will give a strong impulse to the negotiations on the operation of the bauxite mines of Adamaoua and the S4 route plan. Design will be limited to a feasibility study, including technical, socio-economic and environmental aspects.

Services

  • Data collection and analysis
  • Preliminary design
  • Legal and institutional study with a financial aspect
  • Detailed design
  • Environmental and social impact assessment
  • Preparation of tender documents