Drinking Water Supply of the City of Jijel from the Kissir Dam
Client
Groupement KOUGC METITO – Bénéficiaire : ANBT
Country
Algeria
Beginning
2008
End
2013
Description
The project consists of 43km-long ductile iron pipes, a 1.3 m3/s pumping station, distribution tanks and a 100,000 m3/d treatment plant. The project aims to meet water needs of a population of 350,000 inhabitants in 2030.
Services
Review of detailed design and as-built drawings
Technical assistance to the contractor and preparation of as-built drawings