Please enable JS

Works Supervision of the Nouakchott Water Supply Project from the Senegal River (Aftout Essahili)

Client

Unité de Gestion du Projet Aftout Essahli - Société Nationale de l'Eau (SNDE)

Country

Mauritania

Beginning

2005

End

2012

Description

Drinking water supply to the city of Nouakchott is ensured by only the underground water table in Trarza. The Government has decided to perform a new water transfer from the Senegal River to meet water needs by 2020, while reserving the possibility of further reinforcement to bring its capacity up to the estimated needs of the country by 2030. The project consists of supplying the city of Nouakchott with drinking water from the Senegal River 200km south of the capital.

Services

  • Review and approval of detailed design
  • Definition of equipment and construction works technical specifications, preparation of tender documents
  • Client assistance with construction works contract award
  • Approval of contractors as-built drawings
  • Construction works supervision

Newsletter